1、船体

1.56分段完工后结构完整性和焊缝检查

Inspection structure integrity and welding seam on completing No.56 block.2.上层建筑完后结构完整性检查

Inspection structure integrity after completing the superstructure.3.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查

Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.4.上层建筑合拢后结构完整性检查

Checking structure integrity of superstructure(deckhouse)after closed.5.货舱口围板船上安装精度检查

Inspecting fitting accuracy of hatch coaming on berth.6.货舱口围板焊接后焊缝检查

Inspecting welding seam of hatch coaming after welding.7.No1压载水舱(No.15分段)气压试验(压头试验)检查

Inspection air preure test(with water head) for No1.ballast water tank(No15 block).8.上甲板冲水试验检查

Inspection hosing test for upper deck.9.下水前测量船体主尺度、总长、两柱间长、型宽、型深、基线挠度

Measuring hull’s main dimensions:length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.mld.),depth molded and deflection before launching.10.划线后检查吃水标尺至平板龙骨之间的距离

Inspection distance between draught marks and keel plate after marking out.11.吃水标志(载重线标志)安装后精确性检查

Inspecting fitting accuracy of draught mark(loadline mark).12.载重线标志划线后检查尺度

Inspection dimension of loadline after marking out.13.舵叶完工后检查

Checking rudder after completing(finished).14.货舱舱口盖焊缝和尺度检查

Inspection welding seam and dimension of cargo hatch cover.

2、轮机内场

1.螺旋桨轴(中间轴)机加工尺寸检查

Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).2.检查螺旋桨轴与螺旋桨锥度接触面

Check for surface contact area(metallic contact) between stern shaft and propeller hub tapers.3.舵杆机加工尺寸检查

Inspection machining dimension of rudder stock.4.上舵承组装后检查

Inspection rudder carrier after aembly.5.舵销机加工尺寸检查

Inspection machining dimension of rudder pintle.6.舵杆、舵叶、舵销连接后中心线检查

Inspecting alignment of stock, rudder blade and pintle.7.锚投掷试验和拉力试验

Lowering test and tension test of anchor.8.轴系连接螺栓和孔尺寸测量

Measuring dimension of coupling bolts and reamer hole.

3、轮机外场安装(钳工) 1.防蚀板布置正确性检查

Inspection arrangement correctne of aluminium Anodes.2.船名牌(烟囱标志)安装正确性检查

Inspection installation correctne of ship’s name plate(funnel mark).3.水密小舱口盖(水密门、窗)启闭灵活性检查

Flexibility and hosing test for small water tight hatch cover(water tight door and window).4.货舱舱口盖密性试验(启闭试验、应急启闭试验)

Tightne test(opening and closing test,emergency opening and closing test)for cargo hatch cover.5.弃锚装置检查

Inspecting anchor throwing away appliance.6.轴、舵系镗孔前中心线定位检查

Inspecting centerline positioning for shaft system and rudder system before boring.7.轴系镗孔后光学校中检查

Optical aligned check for shaft system after boring.8.艉轴管滑油液压试验

Hydraulic test for L.O.pipe for stern tube.9.艉轴管前、后轴承与衬套直径测量

Measuring diameter of fore and aft stern tube bearing and bushes.10.艉轴管前、后衬套压入检查

Inspection push-up load for fore and aft stern tube bushes.11.螺旋桨轴与轴承间隙测量

Measuring clearance between propeller shaft & bearing.12.螺旋桨压入检查

Inspection wet fitting the propeller.

13.艉轴密性装置的安装与密性试验

Fitting and tightne testing of propeller shaft before launching(after sea trial).14.艉轴管滑油系统的投油清洗 Flushing L.O.system of stern tube.15.舵叶0位检查

Inspecting zero(datum) position of rudder blade.16.舵装置完整性与轻便性检查

Inspecting integrity and flexibility of rudder appliance.17.舵止跳块的间隙测量

Measuring clearance of rudder jumping stopper.18.操舵装置完整性检查

Inspecting integrity of steering gear.19.舵轴承安装间隙测量

Measuring installation clearance of rudder bearing.20.舵机管路系统的投油清洗

Flushing of piping system for steering gear.21.舵机系泊试验

Mooring test of steering gear.22.舵机航行中操舵试验

Manoeuving test of steering gear during sea trial.23.舵机应急操舵试验

Emergency manoeuving test of steering gear.24.锚机管路系统的投油清洗 Flushing of piping system for windla.

25.锚机安装与校中检查

Installation and alignment inspection of windla.26.锚机系泊试验 Mooring test of windla.27.锚机航行中抛起锚试验

Anchoring and weighting test of windla on sea trial.28.绞缆机完整性检查

Inspection integrity of mooring winch.29.绞缆机管路系统的投油清洗

Flushing of piping system for mooring winch.30.绞缆机系泊试验

Mooring test of mooring winch.31.舵机(锚机、绞缆机)液压系统安全装置调整

Adjusting safety device for hydraulic system of steering gear(windla、mooring winch).32.4吨食物吊运转试验和吊重试验

Running test and hoisting test for 4t provision crane.33.救生艇收放试验 Lowering and hoisting test for life boat.34.救生艇航行试验

Sea trial for life boat.35.舷梯(引水员梯)压重试验

Loading test of accommodation ladder(pilot ladder).36.舷梯(引水员梯)和绞车收放试验

Lowering and hoisting test of accommodation ladder(pilot ladder).37.货舱舱口盖启闭试验

Opening and closing test for cargo hatch cover.38.货舱舱口盖应急启闭试验

Emergency opening and closing test for cargo hatch cover.39.水密小舱口盖(水密门、窗)启闭灵活性检查和冲水试验

Flexibility and hosing test for small water tight hatch cover(water tight door and window).40.主机垫片检查

Checking liner of main engine(M.E.).41.主机贯穿螺栓紧固度检查

Tightening inspection for through bolts of main engine(M.E.).42.下水后主机曲轴和中间轴连接后校中

Aligning main engine’s crank shaft and intermediate shaft after launching.43.下水后中间轴和螺旋桨连接后校中

Aligning intermediate shaft and propeller shaft after launching.44.主机动车前(航行试验后)曲轴甩档测量

Measuring deflection of crank shaft of M.E.before starting up(after sea trial).45.主机滑油(燃油)管路投油清洗 Flushing lubrication oil(fuel oil) system of M/E.

46.轴带发电机及齿轮箱安装检查

Alignment inspection installation of shaft generator and gear box.47.主机报警和安全装置试验

Alarm testing and safety device testing of M/E.48.主机系泊(航行)试验并检查其附属泵与管路

Mooring test(sea trial) of M.E.and inspection attached pumps and piping system.49.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验

Running test of shaft generator and clutching test between M.E.and shaft generator.50.航行试验中轴带发电机与柴油发电机之间的换车试验

Change over test between shaft generator and diesel generator on sea trial.51.主机航行试验后的拆检

Overhauling main engine after sea trial.52.主柴油发电机组安装检查

Installation inspection of main diesel generator.53.主柴油发电机动车前(系泊试验后)曲轴甩档测量

Measuring deflection of crank shaft of main diesel generator before running test(after sea trial).

54.主柴油发电机的报警和安全装置试验

Alarm and safety device testing of main diesel generator.55.主柴油发电机运转试验

Running test of main diesel generator.56.应急柴油发电机运转试验

Running test of emergency main diesel generator.57.应急柴油发电机的安全装置试验

Safety device testing for emergency diesel generator.58.主(辅)空气压缩机的充气试验、安全阀和自动装置的调整

Charging test and safety valve and automatic device adjusting for main compreor(auxiliary compreor).59.应急空气压缩机的运转试验、安全阀和安全装置的调整

Running test and safety valve and safety device adjusting for emergency compreor.60.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整

Air tightne test and safety valve adjusting for main air receiver (control air receiver, air horn receiver)on board.61.辅锅炉(废气锅炉)装船后气密试验

Air tightne test for auxiliary boiler (economize boiler) on board.62.辅锅炉安全阀检验及蓄压试验

Safety valve adjusting and accumulating test for auxiliary boiler.63.辅锅炉自动控制装置试验

Automatic controller test for auxiliary boiler.64.废气锅炉效用试验

Function test for economizer.65.压载泵效用试验和自动控制装置试验

Function test and automatic controller test for ballast pump.66.舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验

Function test of bilge oily water separator (sewage treatment plant, fresh water generator, incinerator).67.机舱行车吊重试验

Hoisting test of engine room crane.68.机修间设备运转试验

Running test of machines in repair room.

无线电话 radio telephone 电视机和收音机 TV and radio set 电视机和收音机天线共用器

antenna multi coupler of TV and radio set 电罗经 gyro compa 磁罗经 magnetic compa 电脉冲 electrical impulse 应急电站 emergency power station 扬声器 loud speak 继电器 relay contact 配电板 switch board 配电箱 distribution box 变压器 transformer 保险丝 fuse 蜂鸣器 buzzer

69.敷板前驾驶室检查主干电缆安装

Inspection main cable installation for wheel house before paneling decoration.70.总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).

船舶制造英语日常用语

船舶制造英语日常用语上层建筑

船舶制造英语日常用语 船体

船舶制造必备英语日常用语1000句

船舶智能制造

船舶制造基础知识

船舶制造工艺

船舶制造英汉词典

船舶制造专业英语

江苏省船舶先进制造技

船舶制造英语日常用语
《船舶制造英语日常用语.doc》
将本文的Word文档下载到电脑,方便编辑。
推荐度:
点击下载文档
点击下载本文文档